Stavian targets 300 MW for Ho Chi Minh City AI campus
Hung Minh Nguyen · 25 September 2026
Stavian says its proposed Ho Chi Minh City campus could reach 300 MW in a first phase by 2030, with up to 200 Tb per second in subsea connectivity. A USTDA funded feasibility study must test the plan before construction or capacity is assured.