tag#feasibility-study
5 articles
APTelecom will handle international connectivity, subsea cable integration and carrier strategy in the Stavian Digital Park feasibility study. The new scope defines network planning responsibilities, without confirming capacity or construction.
A Cushman & Wakefield study for Stavian Digital Park arrives as the firm ranks Vietnam the most underserved data center market in Asia Pacific, with about 1.4 million people per megawatt and Ho Chi Minh City pipeline demand at 68 MW. The numbers frame the 300 MW campus plan.
USTDA is funding a feasibility study for Stavian Digital Park, a planned AI data centre campus in Ho Chi Minh City. The study will map power, cooling, connectivity, financing and procurement needs, but construction remains uncommitted.
Stavian says its proposed Ho Chi Minh City campus could reach 300 MW in a first phase by 2030, with up to 200 Tb per second in subsea connectivity. A USTDA funded feasibility study must test the plan before construction or capacity is assured.
TNT Group and Texas based Infrakey DC Parks signed an MoU to study a multi phase AI data centre programme in Vietnam. The buildout could reach 1,000 MW and cost up to $10 billion, with an initial 200 MW phase and power delivery possible within 36 months of securing a site and grid allocation.