Samsung Electronics is considering adding a NAND flash packaging line to its semiconductor test plant in Thai Nguyen province by 2030, according to a Digitimes report on 17 November that Korean outlets picked up the next day. The addition would let the site assemble and test memory chips in one place, rather than packaging them in South Korea and shipping them to Vietnam for final checks.

The test plant itself is still under construction. The-Delta.io reported in October that Samsung submitted a plan for 2 plants at Yen Binh Industrial Park, with the first line targeted for Q4 2027 and total investment through the second plant estimated at about 5.48 trillion won. A separate Korean report put the initial outlay at roughly 1.5 billion USD. The figures cover different scopes, and Samsung has not published a budget for the packaging line.

The logic is a division of labour between the 2 countries. Samsung wants to move general NAND packaging, which carries lower margins, out of its Onyang and Cheonan sites so that floor space and equipment there can go to high bandwidth memory and advanced packaging. Demand for high bandwidth memory has surged with AI infrastructure spending. Vietnam would absorb annual volumes measured in hundreds of billions of gigabits of general DRAM and NAND under the plan.

Vietnam is already a backend location for other chipmakers, including Intel and Amkor, so the plan is less a first move than a deepening of an existing supply chain. What is not settled is whether Samsung turns the proposal into an approved investment. A packaging line depends on the test plant reaching full operation and on general NAND demand staying strong enough to justify shifting the work offshore.