HCMC proposes a programme in which banks submit operating problems for technology companies and researchers to solve, Vietstock reported from the Vietnam Retail Banking Forum on September 30. The science and technology department outlined shared capabilities needed for the international financial centre.
The computing requirements include financial grade cloud and data centres, high bandwidth connectivity, AI computing and recovery arrangements for continuous operations. The data layer would combine common standards, real time data and controlled API sharing for digital identification, credit scoring and fraud prevention.
The department also described controlled trials for financial AI, blockchain, RegTech and Open Finance, limited in scope and duration before evaluation for wider use. Security priorities include Zero Trust architecture, hardware encryption and continuous monitoring through a security operations centre.
The proposed delivery model connects regulators, banks, technology firms, universities and researchers, and investment funds. Priorities include shared technology capacity, a centre tied to controlled testing and the bank problem programme; the report does not disclose awarded contracts, budgets or individual trial approvals.
The-Delta's Takes Editorial Analysis
What This Means
Earlier Delta coverage of the November VIFC deadline focused on converting products and investor commitments into transactions. The new department presentation adds the technical dependencies behind those transactions and a proposed way to gather demand from banks. Foreign cloud, fraud detection, API and security suppliers can map capabilities to named operating needs, then seek a bank sponsor and a defined test. The shared capability model makes interoperability and service accountability central vendor questions rather than treating each product as a standalone demonstration.
Execution Reality Medium
Earlier Delta coverage of the 2027 full activation roadmap described 2026 as institutional preparation. The September presentation remains consistent with that stage: it defines requirements and proposes delivery mechanisms without establishing commissioned infrastructure. The source also invokes city sandbox powers, but supplies no trial decision or application conditions. Suppliers must verify the authority, permitted data use, scope and duration of a specific approval before deploying a regulated service. November deal delivery and 2027 broader activation are different milestones.
The Signal
Watch for a bank problem list with named sponsors, budgets, data access conditions and procurement or trial procedures. An approved deployment with measurable service reliability, fraud results or credit decision outcomes would show whether shared infrastructure priorities are becoming bank operations.